Project Description:
The Project involves the opportunity to optimize the benefit from the MWSS-owned auxiliary turbines 4 and 5 by developing the hydropower generation component, a “by-product” of water releases.
Location:
Norzagaray, Bulacan
Project Cost:
PhP 1.155 B
Funding Source:
PPP
Status: (as of 30 June 2019)
- On-going preparation of NEDA-ICC and DOF requirements, among others, is the financial model being attended to by the Inter-Agency TWG (NPC/PSALM, DOE, MWSS & PPP Center) and the MWSS-hired financial expert
- The project was presented to the Regional Development Council Region III on 21 June 2019 for the required RDC endorsement.