Rehabilitation, Operation and Maintenance of AHEPP Auxiliary Turbines 4 and 5

Project Description:

The Project involves the opportunity to optimize the benefit from the MWSS-owned auxiliary turbines 4 and 5 by developing the hydropower generation component, a “by-product” of water releases.

Location:

Norzagaray, Bulacan

Project Cost:

PhP 1.155 B

Funding Source:

PPP

Status:  (as of 30 June 2019)

  • On-going preparation of NEDA-ICC and DOF requirements, among others, is the financial model being attended to by the Inter-Agency TWG (NPC/PSALM, DOE, MWSS & PPP Center) and the MWSS-hired financial expert
  • The project was presented to the Regional Development Council Region III on 21 June 2019 for the required RDC endorsement.