To ensure Concessionaires’ compliance to the original Concession Agreement (1997-2022) and the Concession Agreement’s Term Extension (2022-2037) on water supply connection

Projects:

  1. Angat Water Transmission Improvement Project (AWTIP)
  2. Rehabilitation of Umiray-Angat Transbasin Tunnel Facilities

Imperatives:

Ensure Concessionaire compliance to the CA Term Extension Targets for 2011-2037; in summary:

  • 100% Water Connection (24 hours, psi) by Manila Water: 2015 and Maynilad: 2017
  • NRW:  Manila Water: 2% existing; Maynilad: 6% by 2017