Rehabilitation, Operation and Maintenance of AHEPP Auxiliary Turbines 4 and 5

Project Description:

The Project involves the opportunity to optimize the benefit from the MWSS-owned auxiliary turbines 4 and 5 by developing the hydropower generation component, a “by-product” of water releases.

Location:

Norzagaray, Bulacan

Project Cost:

PhP 1.155 B

Funding Source:

PPP

Status:  (as of 30 September 2017)

  • On-going review of bidding documents, including discussion with NEDA as to other alternative mode of procurement process.
  • Awaiting OGCC Opinion on the MWSS’ proposal to enter into a Lease Agreement with the AHEPP owner, Angat Hydropower Corporation (AHC).